EEE 510 · Power Systems Engineering
Our notes
2 min readCost curves
A thermal unit's fuel cost is commonly modelled as a quadratic: C(P) = a + bP + cP² (cost per hour, P in MW). The incremental cost dC/dP = b + 2cP is the cost of one more MW.
Economic dispatch (losses neglected)
Share a total demand P_D among committed units to minimise total cost. Using a Lagrange multiplier λ, the optimum is reached when all units run at the same incremental cost: dC_i/dP_i = λ, with ΣP_i = P_D (and each P_i within its limits).
Worked example
Two units (cost in ₦'000 per hour):
- C1 = 500 + 5.3P1 + 0.004P1², so IC1 = 5.3 + 0.008P1
- C2 = 400 + 5.5P2 + 0.006P2², so IC2 = 5.5 + 0.012P2
Demand: 800 MW.
- P1 = (λ − 5.3) ÷ 0.008 and P2 = (λ − 5.5) ÷ 0.012.
- Their sum = 800. Multiply through by 0.024: 3(λ − 5.3) + 2(λ − 5.5) = 19.2, so 5λ − 26.9 = 19.2 and λ = 9.22.
- P1 = 3.92 ÷ 0.008 = 490 MW; P2 = 3.72 ÷ 0.012 = 310 MW. Sum 800. ✓
- Costs: C1 = 500 + 2,597 + 960.4 = 4,057.4; C2 = 400 + 1,705 + 576.6 = 2,681.6; total 6,739.0 (₦'000 per hour).
Check against an equal split (400 MW each): C1 = 500 + 2,120 + 640 = 3,260; C2 = 400 + 2,200 + 960 = 3,560; total 6,820. Economic dispatch saves 81 (₦81,000) every hour. ✓
Generator limits
If a unit's optimal output breaks its limit, fix it at the limit and share the rest among the others at a new equal λ. If unit 1 had a maximum of 450 MW: P1 = 450, P2 = 350, and unit 2 runs at IC2 = 5.5 + 0.012 × 350 = 9.7, higher than unit 1's 8.9.
Including transmission losses
Losses depend on where power is generated. Losses are often written with B-coefficients (Kron's loss formula): P_L = ΣΣ P_i B_ij P_j. The optimum becomes λ = IC_i × L_i, where L_i = 1 ÷ (1 − ∂P_L/∂P_i) is the penalty factor: units far from load (high incremental losses) are penalised.
Unit commitment
Before dispatch, decide which units to run in each hour, considering start-up costs, minimum up and down times, spinning reserve and ramp rates. Solved by priority lists, dynamic programming or mixed-integer programming. Hydro-thermal coordination plans water use (Kainji, Jebba, Shiroro) with thermal units across seasons.
Exams usually ask: derive the equal incremental cost criterion; solve a two- or three-unit dispatch with or without limits; explain penalty factors; distinguish unit commitment from economic dispatch.
Common mistake: equalising the total costs or average costs of units. It is the incremental costs that must be equal.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Merit order
(opens en.wikipedia.org in a new tab)
Wikipedia, Merit order, CC BY-SA 4.0 · licence
-
Unit commitment problem in electrical power production
(opens en.wikipedia.org in a new tab)
Wikipedia, Unit commitment problem in electrical power production, CC BY-SA 4.0 · licence
Watch
-
Best pick Economic Load Dispatch
9 min · ≈ 41 MB · about ₦23
(opens youtube.com in a new tab)
-
Economic Load Dispatch (Solved Problem 1)
7 min · ≈ 32 MB · about ₦18
(opens youtube.com in a new tab)
-
Transmission Loss Formula by B Coefficients - Economic Operation of Power System - Power System 3
24 min · ≈ 108 MB · about ₦61
(opens youtube.com in a new tab)
-
03- Introduction to Optimization and Economic Dispatch, part 1
1 h 12 min · ≈ 324 MB · about ₦182
(opens youtube.com in a new tab)
-
05 Unit Commitment
1 h 18 min · ≈ 351 MB · about ₦197
(opens youtube.com in a new tab)
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.