MEG 508 · Power Plant Engineering

Methods of power generation, load curves and plant performance

Types of power plants, base and peak load, load and capacity factors, diversity, and choosing the plant mix.

Our notes

2 min read

Methods of generating electricity

PlantEnergy conversionTypical role
Steam (coal, gas, oil, biomass, nuclear)heat → steam → turbine → generatorbase load
Gas turbine (open cycle)fuel combustion → hot gas → turbinepeak load, fast start
Combined cyclegas turbine + heat recovery steam cyclebase and intermediate
Diesel/gas enginesinternal combustionsmall plants, standby, islands
Hydropotential energy of water → turbinebase or peak (storage)
Solar PVlight → electricity directlydaytime, variable
Windkinetic energy of air → turbinevariable
Geothermalearth heat → steambase load

Most use a turbine driving an alternator (synchronous generator); Nigeria's grid frequency is 50 Hz, so a 2-pole generator turns at 3,000 rpm.

Load curves

  • Load curve: demand against time of day.
  • Load duration curve: loads arranged from highest to lowest; area = energy.
  • Base load (always present), intermediate, peak load (short periods).

Base load suits plants with low running cost (hydro, nuclear, efficient steam/combined cycle); peak load suits plants with low capital cost and fast start (open-cycle gas turbines, diesel, pumped storage).

Performance factors

  • Load factor = average load ÷ peak load (over a period).
  • Capacity (plant) factor = actual energy ÷ (rated capacity × hours).
  • Demand factor = maximum demand ÷ connected load.
  • Diversity factor = sum of individual maximum demands ÷ maximum demand of the whole system (≥ 1): consumers do not peak together.
  • Utilisation factor = maximum demand ÷ rated plant capacity.
  • Reserve capacity = installed capacity − maximum demand.

Worked example

A plant rated 100 MW has a peak load of 80 MW and generates 438 GWh in a year.
Average load = 438,000 MWh/8,760 h = 50 MW.
Load factor = 50/80 = 0.625. Capacity factor = 50/100 = 0.50. Utilisation factor = 80/100 = 0.80.
If the consumers' individual maximum demands add up to 100 MW, the diversity factor = 100/80 = 1.25.

Choosing the plant mix

Consider fuel availability (Nigeria has large gas reserves), capital and running costs, load shape, location (near load, water, fuel, transmission), environmental impact, reliability and grid stability.

Exams usually ask

  • Define load factor, capacity factor, diversity factor and utilisation factor; solve problems.
  • Sketch load and load duration curves and explain base and peak load plants.
  • Compare methods of power generation.

Common mistake

Confusing load factor with capacity factor. Load factor compares average with peak load; capacity factor compares average with rated capacity.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All MEG 508 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.