2 min readCosts of a power plant
- Capital (fixed) costs: land, buildings, equipment, installation, interest during construction. Expressed per kW of capacity (₦/kW or US$/kW).
- Fixed annual costs: interest on capital, depreciation, insurance, taxes, fixed staff and maintenance: incurred whether or not the plant runs.
- Variable (running) costs: fuel (the largest for thermal plants), variable maintenance, consumables: depend on energy generated.
Hydro: high capital, very low running cost. Gas turbine: low capital, high fuel cost.
Annual cost and cost per kWh
Annual cost = fixed cost + variable cost × energy. Cost per kWh = annual cost ÷ kWh generated: falls as the load factor rises because fixed costs are spread over more energy.
Worked example: capital recovery
A plant costs US$1,000 per kW; interest 10%; life 25 years.
Capital recovery factor CRF = i(1 + i)ⁿ/((1 + i)ⁿ − 1) = 0.1 × 10.835/9.835 = 0.1102.
Annual capital charge = 1,000 × 0.1102 = US$110.2 per kW per year.
At a capacity factor of 0.8 the plant generates 0.8 × 8,760 = 7,008 kWh per kW per year, so capital cost per kWh = 110.2/7,008 = 1.57 US cents/kWh. At 0.4 it doubles to 3.14 cents.
Heat rate and fuel cost
Heat rate = heat input per kWh = 3,600/η (kJ/kWh).
At η = 35%: heat rate = 10,286 kJ/kWh (about 9.75 MMBtu per MWh, using 1 MMBtu = 1,055,056 kJ).
Fuel cost per kWh = heat rate × fuel price. Gas at US$3 per MMBtu: 10,286/1,055,056 × 3 = US$0.029 per kWh (2.9 cents).
Levelised cost of electricity (LCOE)
Total lifetime cost (discounted) ÷ total lifetime energy (discounted): compares technologies fairly. Solar and onshore wind are now among the cheapest new sources in many countries; storage adds cost.
Tariffs
- Flat rate, block rate, two-part tariff (a demand/fixed charge per kW plus an energy charge per kWh), time-of-use, prepaid.
- In Nigeria NERC sets tariffs through the Multi-Year Tariff Order (MYTO); since 2024 customers are grouped into service bands (Band A for at least 20 hours of supply a day pays the highest rate); check current tariffs.
- Problems: tariffs below cost-reflective levels, collection losses, estimated billing (metering gap).
Choosing plants
Compare LCOE, capacity factor, flexibility, fuel security, construction time, environmental cost and grid needs. A mix is used: low running cost plants for base load, cheap-to-build plants for peaks.
Depreciation methods
- Straight line: (cost − salvage)/life each year.
- Sinking fund: set aside an annual amount that grows with interest to replace the plant.
- Diminishing balance: a fixed percentage of the remaining value.
Exams usually ask
- Distinguish fixed and variable costs; calculate the cost of generation per kWh at different load factors.
- Calculate heat rate and fuel cost per kWh.
- Explain the types of tariff and discuss electricity pricing in Nigeria.
Common mistake
Comparing plants on capital cost alone. A cheap-to-build plant with expensive fuel can cost more per kWh over its life than a costly hydro plant.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Levelized cost of electricity
(opens en.wikipedia.org in a new tab)
Wikipedia, Levelized cost of electricity, CC BY-SA 4.0 · licence
-
Cost of electricity by source
(opens en.wikipedia.org in a new tab)
Wikipedia, Cost of electricity by source, CC BY-SA 4.0 · licence
Watch
-
Best pick Load Factor, Diversity Factor and Plant Factor | Factors of Economic Power Generation
9 min · ≈ 41 MB · about ₦23
(opens youtube.com in a new tab)
-
Introduction to Economics of Power Generation - Conventional and Non Conventional Power Generation
11 min · ≈ 50 MB · about ₦28
(opens youtube.com in a new tab)
-
The Economics of Nuclear Energy
16 min · ≈ 72 MB · about ₦40
(opens youtube.com in a new tab)
-
Lecture 38-Economic of power generation
31 min · ≈ 140 MB · about ₦79
(opens youtube.com in a new tab)
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.