ENG 502 · Engineering Management
Our notes
3 min readWhy it matters
Materials and bought-in equipment are often more than half the cost of an engineering project or plant. Late or wrong materials stop work; too much stock ties up money and spoils.
The purchasing (procurement) cycle
- Identify the need (requisition with a clear specification).
- Source suppliers: approved vendor list, enquiries, requests for quotation.
- Evaluate bids: price, quality, delivery time, technical compliance, after-sales service, total cost of ownership.
- Negotiate and place the purchase order (terms: price, delivery, payment, warranties, Incoterms for imports).
- Expedite (follow up) and inspect (factory acceptance tests for critical items).
- Receive, check and store; record in the inventory system.
- Pay the invoice after matching order, delivery note and invoice ("three-way match").
- Evaluate supplier performance.
Supplier selection criteria
Quality and certification, price and payment terms, delivery reliability, technical support and spare parts, financial stability, location and logistics, local content (the Nigerian Oil and Gas Industry Content Development Act 2010 requires preference for Nigerian goods and services where competent), ethics and anti-corruption.
Imports and Nigerian conditions
Lead times for imported items can be long (shipping, port clearance, customs), and exchange rates change costs: plan early, use reliable clearing agents, and keep critical spares in stock.
Inventory
Types
Raw materials, work in progress, finished goods, maintenance, repair and operating (MRO) spares, consumables.
Costs
- Ordering cost (per order: processing, transport, inspection).
- Holding (carrying) cost (per unit per year: capital, storage, insurance, deterioration, often 15-30% of item value a year).
- Shortage (stock-out) cost: downtime, lost sales.
Economic order quantity (EOQ)
EOQ = √(2DS/H), where D = annual demand, S = cost per order, H = holding cost per unit per year.
Example
A plant uses D = 4,800 bearings a year; S = ₦10,000 per order; H = ₦400 per bearing per year.
EOQ = √(2 × 4,800 × 10,000/400) = √240,000 ≈ 490 bearings, about 10 orders a year.
Check: at EOQ, yearly ordering cost (4,800/490 × 10,000 ≈ ₦98,000) equals yearly holding cost (490/2 × 400 = ₦98,000) ✓.
Reorder point and safety stock
- Reorder point (ROP) = demand during lead time + safety stock.
- Example: 4,800 bearings over 300 working days = 16 a day; lead time 10 days; safety stock 40: ROP = 16 × 10 + 40 = 200. Order 490 whenever stock falls to 200.
- Safety stock protects against uncertain demand and delivery; it is larger for long or unreliable lead times.
ABC analysis
Classify stock items by annual usage value (quantity × unit cost):
- A items: about 10-20% of items, about 70-80% of value: tight control, frequent review, careful forecasting.
- B items: middling.
- C items: many items, little value: simple controls, larger orders.
Critical spares (a compressor rotor) may need tight control even if rarely used: combine ABC with VED (vital, essential, desirable) analysis.
Stores management
Proper receipt and inspection, labelling and bin locations, first in, first out (FIFO) for perishable items (paints, chemicals, rubber seals), stock counts, security against theft, and good records (an inventory or ERP system).
Exams usually ask
- Describe the purchasing cycle and supplier selection.
- Derive and use the EOQ formula; calculate reorder points.
- Explain ABC analysis.
Common mistake
Choosing the supplier with the lowest price only. Late delivery, poor quality or no spare parts can cost far more than the price saved.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Best pick Introduction to Business, 10.4 Pulling It Together: Resource Planning
(opens openstax.org in a new tab)
OpenStax, Introduction to Business, 10.4 Pulling It Together: Resource Planning, CC BY-NC-SA 4.0 · licence
-
Purchasing
(opens en.wikipedia.org in a new tab)
Wikipedia, Purchasing, CC BY-SA 4.0 · licence
-
Materials management
(opens en.wikipedia.org in a new tab)
Wikipedia, Materials management, CC BY-SA 4.0 · licence
-
Inventory control
(opens en.wikipedia.org in a new tab)
Wikipedia, Inventory control, CC BY-SA 4.0 · licence
-
OpenStax, Principles of Management (whole free textbook)
The whole book, free to read online or download as a PDF (the PDF is large: Wi-Fi).
(opens openstax.org in a new tab)
OpenStax, OpenStax, Principles of Management (whole free textbook), CC BY-NC-SA 4.0 · licence
Watch
-
Materials Management | Functions and Objectives of Material Management
3 min · ≈ 14 MB · about ₦8
(opens youtube.com in a new tab)
-
iACT Global Videos | Purchasing and Material Management
5 min · ≈ 23 MB · about ₦13
(opens youtube.com in a new tab)
-
Purchasing and supply management important difference you must know
6 min · ≈ 27 MB · about ₦15
(opens youtube.com in a new tab)
-
PURCHASING AND SUPPLY MANAGEMENT
10 min · ≈ 45 MB · about ₦25
(opens youtube.com in a new tab)
-
Lecture 45 : Basics of Purchasing Management (Contd.)
30 min · ≈ 135 MB · about ₦76
(opens youtube.com in a new tab)
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.