ENG 502 · Engineering Management
Our notes
2 min readProductivity
Productivity = output / input. Inputs: labour, materials, energy, capital, time.
- Partial productivity: output per labour-hour, per kWh, per tonne of material.
- Total factor productivity: output per combined input.
Example
A fabrication shop made 1,200 units with 400 labour-hours (3.0 units per hour). After improvements it made 1,350 units with 375 hours: 3.6 units per hour, a rise of (3.6 − 3.0)/3.0 = 20%.
Why productivity is low (common causes)
Poor planning and scheduling (waiting for materials, tools, instructions), breakdowns and power outages, poor methods and layout, rework from errors, poorly trained or demotivated staff, too much paperwork, absenteeism, and poor working conditions (heat, noise, lighting).
Work study
- Method study: record how a job is done (process charts, flow diagrams), examine it critically (what, where, when, who, how, and why), develop a better method, install and maintain it. The aim: eliminate, combine, rearrange or simplify steps.
- Work measurement: set the standard time for a task: observed time × rating (pace) + allowances (rest, personal needs, contingencies). Used for planning, staffing and incentive schemes.
Example: observed time 10 minutes at a rating of 90% gives basic time 9 minutes; with 15% allowances the standard time = 9 × 1.15 = 10.35 minutes.
Lean thinking
Remove waste (activities that add no value for the customer). The seven wastes: overproduction, waiting, transport, over-processing, inventory, motion, defects (plus unused talent).
Tools: 5S (sort, set in order, shine, standardise, sustain), value stream mapping, just-in-time supply, quick changeovers, visual management, standard work.
Quality approaches
- Total quality management (TQM): quality as everyone's job, customer focus, continuous improvement (kaizen).
- Six Sigma: reduce variation using data (DMAIC: define, measure, analyse, improve, control).
- Statistical process control (SPC): control charts to detect problems before defects are made.
- ISO 9001 quality management systems.
Fewer defects means less rework, so quality and productivity rise together.
Technology and capital
Mechanisation and automation, better tools, computer-aided design and planning, condition monitoring (fewer breakdowns), reliable power (or efficient standby generation), digital records.
People factors
- Training and skills development.
- Motivation: fair pay and incentives, recognition, job security, involvement in improvement (suggestion schemes, quality circles).
- Good supervision and communication.
- Safe, healthy working conditions.
- Teamwork across departments.
Measuring and sustaining improvement
Set baselines, choose a few key performance indicators (KPIs) such as output per hour, overall equipment effectiveness (OEE), rework rate, on-time delivery; review them regularly and keep the gains with standard procedures.
Exams usually ask
- Define productivity and calculate a productivity change.
- Describe method study and work measurement; calculate standard time.
- Discuss ways to improve productivity in an engineering organisation in Nigeria.
Common mistake
Equating productivity with working harder or longer hours. Most gains come from better methods, planning, equipment and quality.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Best pick Introduction to Business, 10.6 Looking for a Better Way: Improving Production and Operations
(opens openstax.org in a new tab)
OpenStax, Introduction to Business, 10.6 Looking for a Better Way: Improving Production and Operations, CC BY-NC-SA 4.0 · licence
-
Productivity
(opens en.wikipedia.org in a new tab)
Wikipedia, Productivity, CC BY-SA 4.0 · licence
-
Time and motion study
(opens en.wikipedia.org in a new tab)
Wikipedia, Time and motion study, CC BY-SA 4.0 · licence
-
Lean manufacturing
(opens en.wikipedia.org in a new tab)
Wikipedia, Lean manufacturing, CC BY-SA 4.0 · licence
-
OpenStax, Principles of Management (whole free textbook)
The whole book, free to read online or download as a PDF (the PDF is large: Wi-Fi).
(opens openstax.org in a new tab)
OpenStax, OpenStax, Principles of Management (whole free textbook), CC BY-NC-SA 4.0 · licence
Watch
-
Productivity Improvement Techniques
8 min · ≈ 36 MB · about ₦20
(opens youtube.com in a new tab)
-
Essential Strategies for Increasing Production Efficiency
5 min · ≈ 23 MB · about ₦13
(opens youtube.com in a new tab)
-
The Productivity Mindset for Engineers
23 min · ≈ 104 MB · about ₦58
(opens youtube.com in a new tab)
-
OM Calculation: Productivity
11 min · ≈ 50 MB · about ₦28
(opens youtube.com in a new tab)
-
Improving Productivity in Building Construction by Repetitions in Products, Processes and Organisati
45 min · ≈ 203 MB · about ₦114
(opens youtube.com in a new tab)
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.