Typical problems and solutions in engineering practice

Lessons from building collapses, plant accidents and failed projects, and how engineers prevent them.

Our notes

3 min read

Why study failures

Engineering advances by learning from failures. Most disasters have several causes: technical errors, poor communication, cost-cutting, weak regulation and ethical lapses.

Building collapses in Nigeria

Nigeria has had many building collapses, especially in Lagos (for example the Ikoyi high-rise collapse of November 2021 and the Synagogue Church guest house collapse of September 2014, which killed over 100 people).
Common causes found by investigations:

  • Building without approved plans or changing designs (adding floors).
  • No soil investigation; weak foundations on poor soil.
  • Substandard materials (low-strength concrete, under-sized or poor-quality steel bars).
  • Lack of supervision by qualified, registered professionals; quacks on site.
  • Poor workmanship (removing formwork too early, poor compaction).
  • Weak enforcement by building control agencies.

Solutions: approved designs by registered engineers and architects; soil tests; material testing (concrete cubes, steel tensile tests); qualified site supervision; stage-by-stage inspection and certification; enforcement of the National Building Code; punishment of offenders.

Industrial and process accidents

  • Bhopal, India (1984): a toxic gas leak from a pesticide plant killed thousands. Causes: safety systems switched off or broken, poor maintenance, cost-cutting, and housing near the plant.
  • Piper Alpha, North Sea (1988): an offshore platform fire killed 167 people. A pump was restarted while its relief valve had been removed for maintenance; the permit-to-work system and handover communication failed.
  • Pipeline explosions and fires in Nigeria, often linked to vandalism and fuel theft, have killed many people; poor surveillance, ageing pipes and community issues add to the risk.

Lessons: hazard studies (HAZOP), permit-to-work systems, management of change, maintenance and inspection, emergency planning, and a safety culture where anyone can stop unsafe work.

Design and communication failures

  • Space Shuttle Challenger (1986): engineers warned that the O-ring seals would fail in cold weather, but managers launched anyway: an ethics and communication failure.
  • Hyatt Regency walkway, USA (1981): a change in a hanger rod detail doubled the load on a connection; it was not properly checked. 114 died.

Lessons: check design changes; engineers must state safety concerns clearly and in writing.

Common problems in Nigerian engineering projects

ProblemSolutions
Poor maintenance culture (plants and roads decay)maintenance budgets, planned preventive maintenance, training, spare parts
Abandoned projectsrealistic feasibility, secured funding, honest costing, phased delivery
Cost overruns and delaysproper surveys, clear scope, competent contractors, scheduling and control
Power supply problemsenergy audits, standby supply, efficient equipment, embedded generation, solar
Imported technology unsuited to local conditionsadaptation, local content, training
Corrosion and harsh environment (coast, oil field)material selection, coatings, cathodic protection, inspection
Community disputesearly consultation, fair compensation, local employment
Erosion and floodingdrainage design, hydrological studies, land-use control

A problem-solving method

  1. Define the problem clearly.
  2. Gather data and find root causes (the "5 whys", fishbone diagrams).
  3. Generate options.
  4. Evaluate them (technical, cost, safety, environment).
  5. Implement, monitor and review.

Exams usually ask

  • Discuss causes of building collapses in Nigeria and how they can be prevented.
  • Use a case study to show the role of ethics in engineering failures.
  • Identify typical problems in Nigerian engineering practice and propose solutions.

Common mistake

Blaming a failure on a single cause ("bad cement"). Investigations nearly always find a chain of technical, management and regulatory failures.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ENG 501 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.