ENG 501 · Professional Practice and Procedures

Engineering projects and the pre-design survey

The project life cycle, feasibility studies, the pre-design site survey, and environmental and social assessment.

Our notes

2 min read

What a project is

A project is a temporary effort with a defined goal, budget, schedule and quality standard: building a bridge, installing a gas plant, upgrading a power substation. It ends when the goal is reached and handed over.

The project life cycle

  1. Identification: a need or opportunity (a community needs water; a company wants more capacity).
  2. Pre-feasibility and feasibility study: is it worth doing?
  3. Pre-design survey and design (conceptual, preliminary, detailed).
  4. Procurement: tendering and contract award.
  5. Construction / implementation.
  6. Testing and commissioning.
  7. Handover, operation and maintenance.
  8. Post-project evaluation (lessons learnt).

The feasibility study

Checks whether the project is:

  • Technically feasible: can it be built with available technology, materials, skills and site conditions?
  • Economically and financially viable: costs, benefits, cash flow, NPV and IRR (ENG 402 Engineering Economics).
  • Environmentally and socially acceptable: impact on land, water, air, communities, land rights.
  • Legally possible: permits, land title, regulations.
  • Operationally sustainable: who will run and maintain it, and with what money? Many Nigerian projects fail here.

The result is a feasibility report recommending go, change or stop.

The pre-design survey

Data collected before design, so that the design fits reality:

  • Topographic survey: levels and features of the site (by land surveyors).
  • Geotechnical (soil) investigation: boreholes, soil tests (bearing capacity, water table): essential for foundations, especially on the soft, waterlogged soils of the Niger Delta.
  • Hydrological data: rainfall, flood levels, drainage (flooding and erosion are major risks).
  • Existing services: pipelines, power lines, roads, water mains (avoid damaging them).
  • Climate: temperature, humidity, wind, corrosion (coastal and industrial atmospheres).
  • Materials and labour available locally, access roads, security.
  • Demand data: traffic counts, population, power or water demand forecasts.
  • Community and stakeholder consultation: host communities' needs and concerns (a key factor for projects in oil-producing areas).

Environmental impact assessment (EIA)

Under the Environmental Impact Assessment Act (1992), major projects (oil and gas facilities, large roads, dams, industrial plants, among others) need an EIA approved by the Federal Ministry of Environment before work starts: describe the project and environment, predict impacts, propose mitigation and monitoring, consult the public. Social impact and health impact assessments may also be required.

Outputs of this stage

A project brief (what is required), a design basis (codes, loads, capacities, standards), survey reports and a budget estimate. Mistakes here (a wrong soil test, an underestimated flood level) are the most expensive to fix later.

Exams usually ask

  • Describe the stages of an engineering project.
  • Discuss the components of a feasibility study.
  • Explain the purpose and content of a pre-design survey and an EIA.

Common mistake

Skipping the geotechnical investigation on a "small" building to save money. Foundation failure is a common cause of cracked and collapsed buildings.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ENG 501 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.