Why hold stock

To meet demand without delay, buy in economic lots, and protect against uncertain supply. But stock ties up money and space, and can spoil or become obsolete.

Costs

CostExample
Ordering (set-up) SPaperwork, transport, set-up per order
Holding HStorage, insurance, capital tied up, per unit per year
ShortageLost sales, downtime
PurchasePrice per unit

Economic order quantity (EOQ)

For steady demand D a year, no shortages and instant delivery:
Q* = √(2DS ÷ H)
At Q*, the yearly ordering cost equals the yearly holding cost.

Worked example

A plant uses D = 12,000 filters a year. S = ₦5,000 per order, H = ₦300 per filter per year.
Q* = √(2 × 12,000 × 5,000 ÷ 300) = √400,000 ≈ 632 filters.
Orders a year = 12,000 ÷ 632 ≈ 19.

Check: ordering cost = (12,000 ÷ 632.5) × 5,000 ≈ ₦94,900; holding cost = (632.5 ÷ 2) × 300 ≈ ₦94,900. Equal, as theory says.

Reorder point

With lead time L and daily demand d: ROP = d × L (+ safety stock).
12,000 a year over 300 working days = 40 a day; with a 5-day lead time, reorder when stock falls to 200 (plus any safety stock).
Check: 40 × 5 = 200.

Safety stock

Covers uncertain demand during the lead time. A higher service level (chance of not running out) needs more safety stock.

Other inventory ideas

  • ABC analysis: A items (few, high value) get close control; C items (many, low value) simple rules.
  • Quantity discounts: compare total cost at the EOQ and at each discount break.
  • Just-in-time: small, frequent deliveries; needs reliable suppliers, often difficult with Nigerian road and port delays.

Replacement of ageing equipment

Running costs rise as machines age. Replace when the average annual cost is lowest.

Worked example

A machine costs ₦1,000,000 (practice figure; resale value ignored). Running costs (₦ thousands) by year: 100, 200, 300, 500, 700.

Replace after n yearsTotal cost (thousands)Average per year
11,000 + 100 = 1,1001,100
21,300650
31,600533.3
42,100525
52,800560

Replace after 4 years.

Check with the rule "replace when next year's running cost exceeds the current average": after year 3 the average is 533.3, and year 4 costs 500 (less), so keep; after year 4 the average is 525, and year 5 costs 700 (more), so replace. Same answer.

Money over time

For long lives, discount future costs to present value (see Engineering Economics, ENG 402).

Exams usually ask

  • Calculate the EOQ and show that ordering and holding costs are equal.
  • Find the optimal replacement age from a cost table.

Common mistake

Choosing the year in which the running cost is lowest. The decision uses the average total cost including the purchase price.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ENG 401 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.