Variable production overhead (absorbed per labour hour)

  • Expenditure variance = actual hours × standard rate − actual cost.
  • Efficiency variance = (standard hours for actual output − actual hours) × standard rate.

Fixed production overhead (absorption costing)

  • Expenditure (spending) variance = budgeted fixed overhead − actual fixed overhead.
  • Volume variance = (actual output − budgeted output) × standard fixed overhead per unit; split into capacity (actual hours − budgeted hours) × rate per hour and efficiency (standard hours − actual hours) × rate per hour.

Sales variances

  • Price variance = (actual price − standard price) × actual quantity sold.
  • Volume variance = (actual quantity − budgeted quantity) × standard profit per unit (or standard contribution under marginal costing).

Worked example

Standard: 2 hours per unit; variable overhead ₦300 an hour; fixed overhead budget ₦1,200,000 for 2,000 units (4,000 hours), so ₦300 an hour (₦600 a unit). Standard selling price ₦5,000; standard profit ₦1,200 a unit.
Actual: 2,100 units made and sold at ₦4,900; 4,300 hours; variable overhead ₦1,333,000; fixed overhead ₦1,250,000.

  • Variable expenditure = 4,300 × 300 − 1,333,000 = 1,290,000 − 1,333,000 = ₦43,000 A.
  • Variable efficiency = (4,200 − 4,300) × 300 = ₦30,000 A.
  • Fixed expenditure = 1,200,000 − 1,250,000 = ₦50,000 A.
  • Fixed volume = (2,100 − 2,000) × 600 = ₦60,000 F: capacity (4,300 − 4,000) × 300 = 90,000 F; efficiency (4,200 − 4,300) × 300 = 30,000 A ✓.
  • Sales price = (4,900 − 5,000) × 2,100 = ₦210,000 A.
  • Sales volume = (2,100 − 2,000) × 1,200 = ₦120,000 F.

Operating statement

Budgeted profit (2,000 × 1,200 = 2,400,000), adjusted by sales variances, then cost variances (favourable added, adverse subtracted), gives actual profit. Considering only these variances (materials and labour at standard): 2,400,000 − 210,000 + 120,000 − 43,000 − 30,000 − 50,000 + 60,000 = ₦2,247,000.

Exams usually ask

  • Calculate overhead and sales variances and prepare an operating statement.
  • Interpret the causes and links between variances.

Common mistake

Valuing the sales volume variance at selling price instead of standard profit (or contribution).

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

Practise

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ACT 314 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.