ACT 314 · Cost Accounting
Our notes
1 min readContract costing: more detail
- Contract account (per contract): debit materials, labour, subcontractors, plant (depreciation or hire), site overheads, head-office charges; credit materials returned or transferred, plant at written-down value at the end, and the cost of work certified or the costs transferred to cost of sales.
- Work certified by the client's engineer or architect; retention (often 5-10%) withheld until the defects period ends.
- Revenue recognition under IFRS 15 over time, using an input method (costs incurred ÷ total expected costs) or output method (surveys, work certified).
- Expected losses recognised in full immediately.
Worked example
Contract price ₦120 m. Year 1: costs incurred ₦45 m; estimated further costs ₦55 m; work certified ₦54 m; cash received ₦48.6 m (90% of certified).
- Total expected cost 100 m; expected profit 20 m.
- Stage of completion (input) = 45 ÷ 100 = 45%.
- Revenue = 0.45 × 120 = ₦54 m; profit = 0.45 × 20 = ₦9 m.
- Retention = 54 − 48.6 = ₦5.4 m (a receivable).
Service costing
Used by organisations selling services: transport, hospitals, hotels, schools, power, banks.
- Composite cost units combine two measures: passenger-km, tonne-km, patient-day, room-night, kWh, student-hour.
- Costs are classified (fixed and variable, or standing, maintenance and running charges in transport) and divided by the cost units.
Worked example: bus company
A bus with 40 seats does 2 return trips a day between Port Harcourt and Owerri (90 km each way), 26 days a month, average occupancy 75%. Monthly costs: driver and conductor ₦300,000; fuel ₦1,404,000; maintenance ₦250,000; depreciation and insurance ₦226,000. Total ₦2,180,000.
- Km per month = 90 × 2 × 2 × 26 = 9,360 km.
- Passenger-km = 9,360 × 40 × 0.75 = 280,800.
- Cost per passenger-km = 2,180,000 ÷ 280,800 = ₦7.76.
- Cost per passenger for one 90 km trip = 7.76 × 90 = ₦699; with a 30% mark-up on cost, fare ≈ ₦909.
Exams usually ask
- Prepare a contract account and compute profit, revenue and retention.
- Compute cost per composite unit for a service business.
Common mistake
Using seat-km instead of passenger-km when occupancy is below 100%.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Best pick Principles of Accounting, Volume 2: Managerial Accounting, 4.8 Explain How a Job Order Cost System Applies to a Nonmanufacturing Environment
(opens openstax.org in a new tab)
OpenStax, Principles of Accounting, Volume 2: Managerial Accounting, 4.8 Explain How a Job Order Cost System Applies to a Nonmanufacturing Environment, CC BY-NC-SA 4.0 · licence
-
Job costing
(opens en.wikipedia.org in a new tab)
Wikipedia, Job costing, CC BY-SA 4.0 · licence
-
Percentage-of-completion method
(opens en.wikipedia.org in a new tab)
Wikipedia, Percentage-of-completion method, CC BY-SA 4.0 · licence
-
NPTEL: Fundamentals of Cost Accounting (Institute of Cost Accountants of India)
Video lectures, many hours in all: watch on Wi-Fi where you can. Indian examples.
(opens nptel.ac.in in a new tab)
NPTEL, NPTEL: Fundamentals of Cost Accounting (Institute of Cost Accountants of India), CC BY-NC-SA 4.0 · licence
Watch
-
CONTRACT COSTING
30 min · ≈ 135 MB · about ₦76
(opens youtube.com in a new tab)
-
Contract Costing - Ex 1 - Notional Profit
25 min · ≈ 113 MB · about ₦63
(opens youtube.com in a new tab)
-
Contract Accounting|| Work Construction Costing|| Contract Costing in Cost Accounting
21 min · ≈ 95 MB · about ₦53
(opens youtube.com in a new tab)
-
Session 20, Cost Accounting -II, Contract Costing
18 min · ≈ 81 MB · about ₦45
(opens youtube.com in a new tab)
-
Contract Costing/Contract Accounts (ICAN, ACCA , ICAG, CPA,CIMA, MI,Cost and Management Accounting)
50 min · ≈ 225 MB · about ₦126
(opens youtube.com in a new tab)
Practise
-
Principles of Accounting, Volume 2: Managerial Accounting, Ch. 4 Multiple Choice
End-of-chapter questions; the answers are in the book's Answer Key. US terms and dollars, same methods.
(opens openstax.org in a new tab)
OpenStax, Principles of Accounting, Volume 2: Managerial Accounting, Ch. 4 Multiple Choice, CC BY-NC-SA 4.0 · licence
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.