  • Datum: a reference surface (mean sea level, or an assumed level such as 100.000 m on a site).
  • Benchmark (BM): a fixed point of known level.
  • Reduced level (RL): the height of a point above the datum.
  • Backsight (BS): the first reading after setting up the level (on a known point).
  • Foresight (FS): the last reading before moving the level.
  • Intermediate sight (IS): readings in between.
  • Change point (CP): a point with both an FS and a BS, used to move the level.

Instruments

Dumpy level, automatic level, tilting level (on a tripod) with a levelling staff; also simple farm tools: a line level, a water-tube level and the A-frame for marking contours.

Height of instrument (HI) method

HI = RL + BS; RL of a point = HI − (IS or FS).

Worked example. BM RL = 100.000 m.

PointBSISFSHIRL
BM1.500101.500100.000
A0.800100.700
B2.10099.400
C (CP)1.2001.800100.90099.700
D2.50098.400

Check: ΣBS − ΣFS = (1.500 + 1.200) − (1.800 + 2.500) = −1.600; last RL − first RL = 98.400 − 100.000 = −1.600 ✓.

Rise and fall method

Compare each reading with the previous one: a smaller reading means a rise. From BM (1.500) to A (0.800): rise 0.700 → RL 100.700 ✓. Check: ΣBS − ΣFS = Σrise − Σfall = last RL − first RL. It also checks intermediate sights, so it is more thorough.

Slope (gradient)

Gradient = vertical difference ÷ horizontal distance. If D is 80 m from BM horizontally: 1.6/80 = 0.02 = 2% (about 1.15°).

Contours

A contour is a line joining points of equal level. Contour interval: the vertical distance between contours.

  • Close contours = steep slope; wide = gentle.
  • V-shaped contours pointing uphill = a valley; pointing downhill = a ridge.
  • Contours never cross (except at overhangs).

Plot from a grid of levels (levels at regular points, interpolated) or by tracing contour lines on the ground.

Farm uses

Contour bunds and terraces, irrigation and drainage channels (grades), fish pond sites, siting buildings and roads, estimating earthwork (cut and fill), deciding where to plough along the contour.

Exams usually ask: complete a levelling table by HI or rise-and-fall with arithmetic checks; characteristics of contours; uses of levelling on the farm.

Common mistake: skipping the arithmetic check. Always confirm ΣBS − ΣFS = last RL − first RL.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All SOS 401 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.