World energy

  • World primary energy still comes mostly from fossil fuels (oil, coal, natural gas: roughly 80%), with growing shares of renewables (hydro, wind, solar) and nuclear.
  • Electricity is about a fifth of final energy use but growing fast (cooling, electric vehicles, digital services).
  • Climate change commitments (Paris Agreement, 2015) push towards low-carbon generation; Nigeria's Energy Transition Plan (2022) targets net zero by 2060.

Energy and development

Electricity use per person tracks income: high-income countries use several thousand kWh per person a year; Nigeria uses only about 150 kWh per person a year (among the lowest in the world; check current World Bank/IEA figures). Reliable power is vital for industry, health, education and jobs.

Nigeria's electricity supply (approximate; check current figures)

  • Installed capacity about 13,000 MW (more with new plants) but available capacity often only 4,000-5,500 MW, and grid delivery lower still.
  • Mix: mostly gas-fired thermal plants (about three-quarters), the rest hydro: Kainji (760 MW), Jebba (578 MW), Shiroro (600 MW), Zungeru (700 MW, from 2023), small hydro; little solar on the grid.
  • Major thermal plants: Egbin (Lagos, gas-fired steam, 1,320 MW), Afam, Okpai, Azura-Edo, the NIPP plants, Geregu, Olorunsogo and others.
  • Suppressed demand is very large: many homes and firms rely on petrol and diesel generators (millions of units), which are costly and polluting.

Causes of the gap

Gas supply problems (pipeline vandalism, pricing), transmission limits and grid collapses, distribution losses and poor metering, liquidity problems (low collection, tariffs below cost), old plants and poor maintenance, insecurity.

Structure of the sector

  • Generation companies (GenCos), privatised in 2013.
  • Transmission Company of Nigeria (TCN): state-owned grid at 330 kV and 132 kV.
  • Distribution companies (DisCos): 11 privatised zones.
  • NERC: the regulator (tariffs, licences); the Electricity Act 2023 lets states regulate their own electricity markets.
  • NBET (bulk trader), the Rural Electrification Agency (mini-grids, solar).

Worked example: demand gap

A city of 2,000,000 people with a target of 600 kWh per person per year needs 1.2 × 10⁹ kWh/year. Average power = 1.2 × 10⁹/8,760 = 137 MW; with a load factor of 0.6 the peak demand is about 228 MW.

Exams usually ask

  • Discuss world energy trends and the shift towards renewables.
  • Describe Nigeria's electricity supply situation and the causes of the gap.
  • Explain the structure of the Nigerian power sector after privatisation.

Common mistake

Quoting installed capacity as if it were available supply. Installed, available and delivered capacity differ greatly in Nigeria.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All SLT 506 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.