PNG 506 · Elements of Reservoir Simulation
Our notes
3 min readSteps of a study
- Define objectives: what decision must the study support? (Is a waterflood worth it? Where to drill two infill wells?)
- Review and gather data: geology, petrophysics, PVT, SCAL, well tests, production history.
- Choose the model: black-oil or compositional; full field, sector or cross-section; grid design.
- Build the model: grid and properties (upscaled), PVT and saturation tables, aquifer, wells.
- Initialise and check: fluids in place against volumetrics; stable initial state.
- History match (if the field has produced).
- Predictions: run development cases under realistic constraints (facility limits, minimum pressures, economic limits on water cut).
- Sensitivities and uncertainty: vary key parameters.
- Economics: combine forecasts with costs and prices (net present value, payback) (links to PNG 507 Petroleum Economics).
- Report and recommend.
Worked comparison (teaching numbers)
A 23 million STB oil reservoir (STOIIP from the black-oil topic), undersaturated (initial pressure 3,500 psia, bubble point 2,200 psia), weak aquifer. A black-oil model with 4 producers is run for 15 years in two cases:
| Case | Plateau rate | Cumulative oil after 15 years | Recovery factor | Comment |
|---|---|---|---|---|
| A. Natural depletion | 4,000 STB/d for 2 years | 4.6 million STB | 20% | pressure falls below bubble point; gas comes out; GOR rises |
| B. Waterflood (2 injectors, voidage replacement) | 4,000 STB/d for 6 years | 8.3 million STB | 36% | pressure kept above 2,500 psia; water cut reaches 85% |
Recovery factor = cumulative / STOIIP: 4.6/23.3 = 19.7% ≈ 20%; 8.3/23.3 = 35.6% ≈ 36%.
Incremental oil from the waterflood = 8.3 − 4.6 = 3.7 million STB. If the injectors, water treatment and extra handling cost the equivalent of 1.5 million barrels, the flood is still clearly worth it, subject to the economics and the range of uncertainty (for example, low and high permeability cases).
Things to look at in the results
- Pressure maintenance and the voidage replacement ratio (injected reservoir volume / produced reservoir volume, aim about 1).
- Sweep: saturation maps showing bypassed oil (targets for infill wells).
- Water breakthrough timing in each producer; early breakthrough suggests high-permeability streaks.
- Gas: if pressure falls below bubble point, free gas reduces oil mobility; plan gas handling instead of flaring (Nigeria's flare-out commitments and the Gas Flare Commercialisation Programme).
Typical Niger Delta features
Stacked sandstone reservoirs separated by shales, many faults, strong aquifers in many fields, high permeabilities (often hundreds of md to darcies), and frequent gas caps; producing from several stacked reservoirs raises questions of commingling and allocation.
The report
Objectives; data and model description; history match quality with plots; prediction cases and results; sensitivities and uncertainty; recommendations; limitations and data to acquire next (new logs, pressure surveys, PVT samples).
In this course
The handbook asks for a simulation study with a black-oil simulator: expect to build a small model (often from a supplied data set) in a commercial or open-source simulator, run cases like those above, and write a report.
Exams usually ask: list and explain the steps of a simulation study; design cases for a given objective; interpret results (recovery factor, incremental oil, water cut, pressure); explain how simulation supports field development decisions.
Common mistake: jumping to prediction runs without checking initialisation and the history match. Errors at the start (wrong fluids in place, unstable initial state) carry through every forecast.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Best pick Lie, An Introduction to Reservoir Simulation (MRST): Reservoir engineering workflows
Open-access chapter: the page has a free PDF. Fuller and more mathematical than our notes, with MATLAB examples. Page about 0.7 MB.
(opens cambridge.org in a new tab)
Lie, An Introduction to Reservoir Simulation Using MATLAB/GNU Octave (Cambridge University Press), Lie, An Introduction to Reservoir Simulation (MRST): Reservoir engineering workflows, CC BY-NC-ND 4.0 · licence
-
Reservoir modeling
(opens en.wikipedia.org in a new tab)
Wikipedia, Reservoir modeling, CC BY-SA 4.0 · licence
Watch
-
Simple 2D Problem in CMG
9 min · ≈ 41 MB · about ₦23
(opens youtube.com in a new tab)
-
CMG Project - Video 1
26 min · ≈ 117 MB · about ₦66
(opens youtube.com in a new tab)
-
1D Single Phase Flow Example in CMG
21 min · ≈ 95 MB · about ₦53
(opens youtube.com in a new tab)
-
Special Topics
45 min · ≈ 203 MB · about ₦114
(opens youtube.com in a new tab)
-
CMG Project - Video 3
24 min · ≈ 108 MB · about ₦61
(opens youtube.com in a new tab)
We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.