Power from water

P = η ρ g Q H
Q = flow rate (m³/s), H = net head (m), η = overall efficiency (turbine × generator, about 0.85-0.9).
Energy depends on both flow (from rainfall and the catchment) and head (from topography and the dam).

Worked example

Q = 300 m³/s, H = 40 m, η = 0.88: P = 0.88 × 1,000 × 9.81 × 300 × 40 = 103.6 MW.

Layout of a hydro plant

  1. Catchment area and reservoir (storage).
  2. Dam (gravity, arch, embankment/earthfill) and spillway (passes floods safely).
  3. Intake with trash racks and gates.
  4. Penstock (pipe to the turbines).
  5. Surge tank (absorbs pressure surges, water hammer, when gates close).
  6. Powerhouse with turbines and generators.
  7. Draft tube (recovers kinetic energy at the turbine exit, allows the turbine to sit above tailwater).
  8. Tailrace returns water to the river.

Classification

By head: low (under about 30 m), medium, high (above about 300 m). By type: storage, run-of-river (little storage), pumped storage. By size: large, small (under about 10-30 MW), mini, micro (under 100 kW).

Turbines

TurbineTypeHeadFlowSpecific speed
Peltonimpulse (jets on buckets)highlowlow
Francisreaction (radial-mixed flow)mediummediummedium
Kaplan / propellerreaction (axial flow, adjustable blades)lowhighhigh
Crossflow, Turgoimpulsesmall plants

Specific speed

N_s = N √P / H^(5/4) (N in rpm, P in kW, H in m): the speed of a geometrically similar turbine producing 1 kW under 1 m head; used to choose the turbine type (roughly: Pelton under about 30-60, Francis about 60-300, Kaplan above about 300 in these units).

Worked example

A turbine at N = 150 rpm produces 40,000 kW under 30 m:
√40,000 = 200; 30^1.25 = 70.2; N_s = 150 × 200/70.2 = 427: a Kaplan turbine.

Cavitation

Low pressure in the runner or draft tube causes vapour bubbles that collapse and pit metal. Controlled by the turbine's setting relative to tailwater (Thoma's cavitation factor).

Nigeria's hydro stations (approximate)

StationRiverCapacity
Kainji (1968)Niger760 MW
Jebba (1985)Niger578 MW
Shiroro (1990)Kaduna600 MW
Zungeru (2023)Kaduna700 MW
Dadin Kowa, Kashimbila and small hydrossmall
Mambilla (planned, 3,050 MW)Donga

Output varies with the season and with upstream flows (from Guinea, Mali and Niger on the River Niger).

Advantages and disadvantages

Advantages: no fuel cost, long life, fast response, low emissions, flood control and irrigation. Disadvantages: high capital cost, displacement of people (Kainji relocated many communities), ecological change, sediment, drought risk, dam safety.

Exams usually ask

  • Calculate hydropower output from flow and head.
  • Describe the parts of a hydroelectric scheme.
  • Compare Pelton, Francis and Kaplan turbines and use specific speed to choose one.

Common mistake

Using gross head in the power equation without subtracting penstock losses. Use the net head at the turbine.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All MEG 508 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.