UNIHIVE

Study Hub UNIPORT GLY 401

GLY 401 · Petroleum Geology

Prospect evaluation and risk

Estimating the chance of success and the possible volumes of a prospect, and deciding whether to drill.

Our notes

2 min read

Two questions

  1. Is there petroleum? (the chance, or probability, of geological success).
  2. How much? (the range of volumes if there is).

Chance of geological success (Pg)

The prospect works only if every element works, so their probabilities are multiplied:
Pg = P(source) × P(reservoir) × P(trap) × P(seal and timing)
Worked example: P(source) 0.9, P(reservoir) 0.8, P(trap) 0.6, P(seal and timing) 0.7. Pg = 0.9 × 0.8 × 0.6 × 0.7 = 0.30: about a 1 in 3 chance. Typical: 0.3-0.5 in a proven play near existing fields; 0.05-0.2 for a frontier wildcat. Each factor is judged from data (seismic quality, nearby wells, analogues), and teams use peer review to avoid over-optimism.

Volumes as ranges

Inputs (rock volume, net-to-gross, porosity, saturation, formation volume factor, recovery factor) are uncertain, so each is given as a range or a probability distribution. Monte Carlo simulation samples them thousands of times and builds the distribution of volumes. Results are quoted as:

  • P90: 90% chance of at least this much (low case);
  • P50: median;
  • P10: 10% chance of at least this much (high case).

Remember: in this convention P90 is the smaller number.

Expected value

Explorers combine the chance and the value:
EMV = Pg × (value if successful) − (1 − Pg) × (cost of a dry hole)
A prospect is drilled if EMV is positive and fits the company's strategy and budget. Small chance can still be worth it if the possible discovery is large, and a portfolio of many prospects spreads the risk.

Appraisal

After a discovery, appraisal wells and tests reduce uncertainty in volumes, contacts, compartments and fluid properties before money is committed to development (wells, platforms, pipelines).

Common biases

  • Over-optimism ("this time it will work").
  • Treating dependent risks as independent (if two reservoirs share a seal, their risks are linked).
  • Anchoring on the first estimate.

Comparing predictions with results after drilling ("look-backs") improves future estimates.

Above-ground risks

In Nigeria, decisions also weigh security, community relations and host community trusts (Petroleum Industry Act 2021), pipeline theft and access to export routes, fiscal terms and licensing rounds (check the current NUPRC terms).

Exams usually ask

  • Calculate the chance of success of a prospect and explain each factor.
  • Explain P90, P50 and P10 and how they are obtained.

Common mistake

Adding probabilities instead of multiplying them. All elements must work together, so the overall chance is the product.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

No reading links here yet

Our team adds free books, videos and practice for each topic, and opens every link before it goes up.

All GLY 401 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.