The idea

Chain surveying fixes points by linear measurements only. The area is divided into a network of triangles (trilateration on a small scale), because a triangle's shape is fixed by its three sides. Detail is fixed from the survey lines by offsets. Best for small, open, fairly flat areas.

Terms

  • Main stations: at the ends of main survey lines.
  • Base line: the longest main line, across the middle of the area; the framework is built on it.
  • Check lines (tie lines): extra lines measured to check the framework.
  • Well-conditioned triangle: no angle less than about 30° or more than about 120°; ideally near equilateral. Very sharp angles make the position of the apex uncertain.

Offsets

Short measurements from a survey line to detail (a fence, a river bank, an outcrop).

  • Perpendicular offsets: at right angles to the line; the right angle can be set with an optical square, cross staff or the 3-4-5 rule.
  • Oblique offsets: two ties from known points on the line to the feature.
  • Keep offsets short (a few metres) for accuracy.

The 3-4-5 rule

A triangle with sides 3, 4 and 5 units (or 6, 8, 10) has a right angle between the 3 and 4 sides, because 3² + 4² = 5².

Booking

The chain survey field book has a central column (the chainage along the line) read from the bottom up, with offsets written left and right and sketches of detail. Each line starts with its station names.

Obstacles

  1. To measuring but not to seeing (a pond, a marsh): measure round it with offsets or a right-angled triangle and compute the hidden length.
  2. To seeing but not to measuring (a river): set out similar triangles on the near bank to compute the width.
  3. To both (a building): continue the line beyond it with perpendiculars or parallels set out on both sides.

Worked example (river width)

From A on the near bank, a tree T on the far bank is straight across. Set out AB = 40 m along the bank at right angles to AT and put a rod at its midpoint O (20 m). At B set out a line at right angles to AB, away from the river, and walk along it until the point C where C, O and T are in line. Triangles AOT and BOC are congruent (equal sides AO and OB, right angles at A and B, opposite angles at O), so AT = BC. If BC measures 36.5 m, the river is 36.5 m wide from A to T.

Plotting

Plot the base line to scale, construct triangles from their sides with compasses, check with the tie lines, then plot offsets.

Exams usually ask

  • State the principle of chain surveying and explain well-conditioned triangles.
  • Describe how to overcome obstacles in chaining.

Common mistake

Using triangles with very small angles. They give poorly fixed points; choose stations that form well-conditioned triangles.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

No reading links here yet

Our team adds free books, videos and practice for each topic, and opens every link before it goes up.

All GLY 346 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.