What capital budgeting is

Deciding which long-term projects to accept: new machines, branches, factories, products. Decisions are large, long and hard to reverse, so they decide the firm's future.

Relevant cash flows

Use incremental, after-tax cash flows: the initial outlay, operating cash flows, working capital put in and recovered, and scrap value. Ignore sunk costs (already spent) and financing costs (they are in the discount rate). Include opportunity costs (a building the firm could have rented out).

Example project

Cost ₦10 m now. Cash inflows: ₦3 m, ₦4 m, ₦4 m and ₦3 m at the ends of years 1 to 4. Required return 12%. Average accounting profit ₦1 m a year.

Payback period

Time to recover the cost. After 2 years ₦7 m is back; ₦3 m of year 3's ₦4 m is needed: payback = 2 + 3 ÷ 4 = 2.75 years. Simple and stresses liquidity, but ignores timing within the period and all cash after payback.

  • Discounted payback uses discounted flows and is longer.

Accounting rate of return (ARR)

ARR = average profit ÷ average investment. With ₦1 m average profit and average investment (10 + 0) ÷ 2 = ₦5 m: 20%. Uses profit, not cash, and ignores timing.

Net present value (NPV)

NPV = present value of inflows − initial cost.

  • PV = 3 ÷ 1.12 + 4 ÷ 1.12² + 4 ÷ 1.12³ + 3 ÷ 1.12⁴ = 2.679 + 3.189 + 2.847 + 1.907 = 10.621.
  • NPV = 10.621 − 10 = ₦0.621 m: accept.

NPV measures the value added to shareholders' wealth, accounts for time and risk (through the rate), and values can be added across projects. It is the preferred method.

Internal rate of return (IRR)

The rate that makes NPV = 0. Try 15%: NPV = −0.021 m. Between 12% (+0.621) and 15% (−0.021), interpolate: IRR ≈ 12 + 3 × 0.621 ÷ (0.621 + 0.021) = 14.9% (a computer gives 14.9% too). Accept if IRR > required return.

Profitability index

PI = PV of inflows ÷ cost = 10.621 ÷ 10 = 1.06. Useful when capital is rationed.

When NPV and IRR disagree

For mutually exclusive projects of different size or timing, the rankings can differ: choose the higher NPV, because IRR assumes reinvestment at the IRR itself and ignores scale. Projects with cash flows that change sign more than once can have several IRRs.

Risk in capital budgeting

Sensitivity analysis (what if sales fall 10%?), scenario analysis, a higher discount rate for riskier projects, and in Nigeria, the effect of exchange-rate moves on imported equipment.

Exams usually ask

  • Compute payback, ARR, NPV, IRR and PI; recommend a decision.
  • Explain why NPV is preferred; identify relevant cash flows.

Common mistake

Including interest on the loan as a project cash outflow while also discounting at the cost of capital: this counts financing twice.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All FIN 232 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.