UNIHIVE

Study Hub UNIPORT ENG 402

ENG 402 · Engineering Economics

Scope of engineering economics and cost concepts

What engineering economic decisions are, the decision steps, and cost terms: fixed and variable, sunk, opportunity, marginal, life-cycle and cash flow diagrams.

Our notes

2 min read

What it is about

Engineering economics compares the money consequences of technical alternatives so the best one is chosen: which pump to buy, whether to replace a generator, whether a mini-grid pays for itself, where to site a plant. Money now is worth more than the same money later, so timing matters.

The decision steps

  1. Recognise the problem and define the goal.
  2. Collect data (costs, revenues, lives, salvage values, interest rate).
  3. Identify feasible alternatives (always include "do nothing" if allowed).
  4. Draw the cash flows of each alternative.
  5. Choose a criterion (present worth, annual worth, rate of return, payback, benefit-cost).
  6. Analyse, including risk and sensitivity.
  7. Choose, and consider non-money factors (safety, environment, community, policy).
  8. Review the result after implementation (post-audit).

Only differences between alternatives matter: costs that are the same for all options can be left out.

Cost terms

  • Fixed costs: don't change with output in the short run (rent, salaries, insurance, loan repayments).
  • Variable costs: rise with output (raw materials, fuel per unit, power, direct labour).
  • Total cost = fixed + variable × quantity.
  • Marginal (incremental) cost: extra cost of one more unit or one more option.
  • Sunk cost: money already spent that can't be recovered. Ignore it in decisions about the future (the ₦2 million already paid for a faulty design is gone whichever option you now choose).
  • Opportunity cost: the benefit given up by not using a resource in its best alternative (a plot of land you own is not "free" for a project: you could have rented or sold it).
  • Direct and indirect (overhead) costs.
  • Recurring and non-recurring costs.
  • Life-cycle cost: all costs from design to disposal: purchase, installation, operation, maintenance, downtime and scrapping. A cheaper generator that burns more diesel may cost far more over its life.
  • Cash cost (money actually paid) versus book cost (such as depreciation: not a cash flow).

Cash flow diagrams

A horizontal time line divided into periods (0 = now, 1, 2, … years). Arrows up = money received, arrows down = money paid. By convention, flows within a year are placed at the end of that year (end-of-period convention), and the first cost at time 0.
Worked example. A machine costs ₦1,000,000 now, saves ₦300,000 a year for 5 years and is sold for ₦100,000 at the end: a down arrow of 1,000,000 at 0; up arrows of 300,000 at 1-5; an extra up arrow of 100,000 at 5. Net cash flow at year 5 = ₦400,000.

Exams usually ask: define engineering economics and its role; the steps of a decision; define and give examples of fixed, variable, sunk, opportunity and life-cycle costs; draw a cash flow diagram from a story.

Common mistake: including sunk costs ("we've already spent so much, we must continue"). Decisions look only at future cash flows that differ between the alternatives.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ENG 402 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.