Progress reports and proposals

Reporting work so far, and writing proposals that win approval or funds.

Our notes

2 min read

Progress report

Tells someone how work is going, so that they can make decisions. Sent at set times: weekly, monthly or per milestone.

Structure:

  1. Project title, period and author.
  2. Summary: one short paragraph. Is it on track?
  3. Work done this period.
  4. Problems, and what you did about them.
  5. Work planned for next period.
  6. Schedule and budget status.

Worked status check

A rig is due at the end of 10 weeks. After 6 weeks, 50% of the work is done and ₦300,000 of a ₦500,000 budget is spent (practice figures).

  • Planned work at week 6: 60%.
  • Schedule: behind by 10 percentage points. At this pace, the project needs 6 ÷ 0.5 = 12 weeks: 2 weeks late.
  • Budget: 60% spent for 50% done. Cost forecast = 300,000 ÷ 0.5 = ₦600,000, or ₦100,000 over.

Check: remaining 50% at the same rate costs another ₦300,000: total ₦600,000. Correct.

Write: "The project is two weeks behind and likely to run ₦100,000 over budget, because bearings arrived late and at a higher price. We recommend..." Report bad news early, with a plan.

Proposal

A proposal persuades someone to approve your work, or give money. It may answer a request (solicited), or come from you (unsolicited).

Structure:

SectionAnswers
Title pageWhat, who, when
SummaryThe whole case, in brief
Problem or needWhy does it matter?
ObjectivesWhat will be achieved?
MethodHow will it be done?
ScheduleWhen?
BudgetHow much?
Team and facilitiesWhy you?
Expected resultsWhat will they get?
References and appendicesSupport

Good objectives

Make them specific and testable.

  • Weak: to study solar water pumping.
  • Better: to design, build and test a solar pump that lifts 2,000 litres a day through 15 m, at Choba, by June 2027.

A worked energy check

A proposal must add up. To lift 2,000 kg through 15 m a day:

Energy = mgh = 2,000 × 9.81 × 15 = 294,300 J = 0.082 kWh of useful energy.

With a pump efficiency of 40% (a practice value): 0.082/0.40 = 0.20 kWh a day from the panel.

Check in joules: 294,300/0.40 = 735,750 J; ÷ 3.6 million = 0.204 kWh. Correct.

A reader who sees this trusts your plan.

Schedule

Use a Gantt chart. Show tasks, durations, milestones and dependencies. Allow extra time for imported parts, and for power cuts.

Budget

  • Itemise: materials, labour, travel, tests and contingency (often about 10%).
  • State prices are estimates, with a date, as prices change. Budgets in these notes are practice figures.
  • Add it up, then check the sum again.
ItemCost (₦)
Materials400,000
Fabrication150,000
Testing50,000
Subtotal600,000
Contingency (10%)60,000
Total660,000

Persuade with reasons

Show the need with evidence, consider the options and explain your choice. Give any risks with a plan. Don't overpromise.

Funding sources

Students may approach their department, an alumni body, a company's CSR programme, or competitions. TETFund funds research through institutions, generally for staff: check current calls with your university.

Exams usually ask: outline a proposal or a progress report; write objectives; draw a simple Gantt chart; state differences between the two.

Common mistake: hiding a problem in a progress report. A reader who's surprised later loses trust; one warned early can help.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ENG 302 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.