ENG 103 · Engineer-in-Society
Our notes
1 min readThe decision process
- Define the problem and the goal.
- List options (always include "do nothing" as a comparison).
- Set criteria (cost, performance, reliability, safety, maintenance, environment, social acceptance) and constraints (must-haves).
- Evaluate each option against the criteria.
- Choose, document the reasons, and review after use.
The weighted decision matrix
Give each criterion a weight (adding to 1.0), score each option (for example 1 to 5), multiply and add.
Worked example: water for a village
Options: solar-powered borehole, hand-pump well, pipe extension from a town 8 km away. Weights: cost 0.4, reliability 0.3, ease of maintenance 0.2, community acceptance 0.1.
| Option | Cost (0.4) | Reliability (0.3) | Maintenance (0.2) | Acceptance (0.1) | Total |
|---|---|---|---|---|---|
| Solar borehole | 3 | 4 | 3 | 5 | 3.5 |
| Hand-pump well | 5 | 3 | 4 | 3 | 4.0 |
| Pipe extension | 2 | 2 | 3 | 4 | 2.4 |
Solar: 3 × 0.4 + 4 × 0.3 + 3 × 0.2 + 5 × 0.1 = 1.2 + 1.2 + 0.6 + 0.5 = 3.5. Hand pump: 2.0 + 0.9 + 0.8 + 0.3 = 4.0. Pipe: 0.8 + 0.6 + 0.6 + 0.4 = 2.4. Hand-pump well wins.
Check the weights: 0.4 + 0.3 + 0.2 + 0.1 = 1.0 ✓. Sensitivity check: if the community cares most about reliability (cost 0.2, reliability 0.5, maintenance 0.2, acceptance 0.1), solar = 0.6 + 2.0 + 0.6 + 0.5 = 3.7 and hand pump = 1.0 + 1.5 + 0.8 + 0.3 = 3.6, so the solar borehole narrowly wins. The weights decide, so agree them with the users before scoring.
Other tools
Cost-benefit analysis (money values for benefits and costs), life-cycle cost (buying + running + maintaining + disposal), and pilot trials.
Exams usually ask: describe the steps in engineering decision making; build and interpret a decision matrix; explain why cheapest is not always best.
Common mistake: comparing only the purchase price. A cheap pump that fails every few months can cost more over its life than a dearer, reliable one.
Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.
Read
-
Best pick Engineering design process
(opens en.wikipedia.org in a new tab)
Wikipedia, Engineering design process, CC BY-SA 4.0 · licence
-
Appropriate technology
(opens en.wikipedia.org in a new tab)
Wikipedia, Appropriate technology, CC BY-SA 4.0 · licence
-
Cost–benefit analysis
(opens en.wikipedia.org in a new tab)
Wikipedia, Cost–benefit analysis, CC BY-SA 4.0 · licence
-
Life-cycle assessment
(opens en.wikipedia.org in a new tab)
Wikipedia, Life-cycle assessment, CC BY-SA 4.0 · licence
We link to free material and never copy it. Every link was opened by our team before it went up.