UNIHIVE

Study Hub UNIPORT CSC 486

CSC 486 · Systems Analysis And Design

The systems development life cycle and its models

The SDLC phases, and the waterfall, prototyping, spiral, incremental, RAD and agile models, with when to use each.

Our notes

2 min read

The SDLC

The systems development life cycle is the series of phases a system passes through from idea to retirement:

  1. Preliminary investigation (planning): define the problem, scope and objectives; initial feasibility.
  2. Systems analysis: study the current system and gather requirements (fact-finding); model them.
  3. Systems design: decide how the new system will work: outputs, inputs, files/database, processes, interfaces, hardware and software.
  4. Development (construction): write and test programs, build the database.
  5. Testing: unit, integration, system and acceptance testing.
  6. Implementation: install, train users, convert data, change over.
  7. Maintenance and evaluation: fix faults, improve, review performance; eventually replace.

Waterfall model

Phases in strict order; each finishes (and is signed off) before the next starts.

  • Pros: simple, well documented, easy to manage; good when requirements are clear and stable (payroll for a fixed policy).
  • Cons: users see nothing until late; changes are expensive; errors in requirements are found late.

Prototyping

Build a quick working model, show users, refine, repeat; then build the real system (or evolve the prototype).

  • Pros: users clarify unclear requirements, early feedback, more user involvement.
  • Cons: users may think the prototype is the finished system; poor documentation; scope creep.

Spiral model (Boehm)

Repeated loops of: set objectives → risk analysis → develop and test → plan the next loop. Good for large, risky projects; needs risk-assessment skills and can be costly.

Incremental model

The system is delivered in parts (increments), each adding features to the last (registration first, then fees, then results). Early delivery of useful parts.

Rapid application development (RAD)

Fast development with user workshops, prototypes, reusable components and strict time boxes (60-90 days). Needs committed users and skilled developers.

Agile methods (Scrum, XP)

Work in short iterations/sprints (1-4 weeks), delivering working software each time; customers involved throughout; respond to change over following a plan. Scrum roles: product owner, scrum master, development team; daily stand-up meetings; product backlog. Widely used today (most app and web teams, including small start-ups).

Choosing a model

SituationSuitable model
Clear, stable requirements; regulatedWaterfall
Unclear requirements, user-facingPrototyping, Agile
Large and high-riskSpiral
Need part of the system earlyIncremental
Tight deadline, small scopeRAD

Exams usually ask: list and explain the SDLC phases; describe waterfall, prototyping and spiral with diagrams, pros and cons; compare traditional and agile approaches; choose a model for a scenario.

Common mistake: writing that maintenance is a minor last step. Maintenance usually costs more than the original development over a system's life.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All CSC 486 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.