Why schedule

When several processes are ready, the short-term scheduler chooses which runs next. Preemptive scheduling can take the CPU away from a running process; non-preemptive lets it run until it finishes or blocks.

Criteria

  • CPU utilisation (keep it busy) and throughput (jobs finished per unit time): maximise.
  • Turnaround time = completion time − arrival time: minimise.
  • Waiting time = turnaround time − burst time (time spent in the ready queue): minimise.
  • Response time = first run − arrival: minimise (important for interactive systems).

Example data (used below)

ProcessArrivalBurst
P108
P214
P329
P435

First-Come, First-Served (FCFS)

Non-preemptive, in arrival order. Gantt: P1 0-8 | P2 8-12 | P3 12-21 | P4 21-26.
Waiting: P1 0, P2 8 − 1 = 7, P3 12 − 2 = 10, P4 21 − 3 = 18. Average = 35/4 = 8.75.
Simple, but short jobs wait behind long ones (convoy effect).

Shortest Job First (SJF, non-preemptive)

When the CPU is free, pick the ready job with the smallest burst. At 0 only P1 is there: P1 0-8. At 8, ready: P2 (4), P3 (9), P4 (5) → P2 8-12, P4 12-17, P3 17-26.
Waiting: P1 0, P2 7, P4 12 − 3 = 9, P3 17 − 2 = 15. Average = 31/4 = 7.75.

Shortest Remaining Time First (SRTF, preemptive SJF)

At every arrival, run the job with the least time left.

  • 0: P1 starts. 1: P2 arrives (4) < P1's remaining 7 → switch to P2.
  • P2 runs 1-5 (P3 at 2 with 9, P4 at 3 with 5 do not beat P2's remaining time).
  • 5: remaining P1 7, P3 9, P4 5 → P4 5-10; then P1 10-17; then P3 17-26.

Gantt: P1 0-1 | P2 1-5 | P4 5-10 | P1 10-17 | P3 17-26.
Waiting (turnaround − burst): P1 (17 − 0) − 8 = 9; P2 (5 − 1) − 4 = 0; P3 (26 − 2) − 9 = 15; P4 (10 − 3) − 5 = 2. Average = 26/4 = 6.5.
SJF/SRTF give the lowest average waiting time, but burst lengths must be predicted and long jobs may starve.

Priority scheduling

Run the highest priority first (often the smallest number = highest). Problem: starvation of low-priority jobs. Fix: ageing (raise priority the longer a job waits).

Round Robin (RR)

Each process gets a time quantum (say q = 4); if not finished it goes to the back of the ready queue. Good for time-sharing.
With q = 4 on the data above:

  • P1 0-4 (4 left). Queue: P2, P3, P4, P1 (P2, P3, P4 arrived during 0-4, before P1 rejoins).
  • P2 4-8 (done). P3 8-12 (5 left). P4 12-16 (1 left). P1 16-20 (done). P3 20-24 (1 left). P4 24-25 (done). P3 25-26 (done).

Completion: P1 20, P2 8, P3 26, P4 25.
Waiting: P1 20 − 0 − 8 = 12; P2 8 − 1 − 4 = 3; P3 26 − 2 − 9 = 15; P4 25 − 3 − 5 = 17. Average = 47/4 = 11.75.
A very large quantum turns RR into FCFS; a very small one causes too many context switches.

Multilevel queues

Separate queues (system, interactive, batch) each with its own algorithm; multilevel feedback queues move a process between queues by its behaviour (CPU-heavy jobs sink to lower priority).

Exams usually ask: define the criteria; draw Gantt charts and compute average waiting and turnaround times for FCFS, SJF, SRTF, priority and RR; preemptive vs non-preemptive; starvation and ageing; effect of quantum size.

Common mistake: forgetting to subtract the arrival time when computing waiting and turnaround times.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All CSC 394 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.