AGR 202 · Introduction to Farm Power and Machinery

Workshop tools and farm building materials

Hand and measuring tools, safety in the farm workshop, and materials for farm buildings and structures: timber, concrete, blocks, metals and roofing, with a concrete mix calculation.

Our notes

2 min read

Farm workshop tools

GroupExamplesUse
Measuring and markingSteel rule, tape, try square, vernier calipers, scriberAccurate sizes
HoldingBench vice, clamps, pliersHolding work
CuttingHacksaw, wood saws, chisels, files, tin snipsShaping metal and wood
StrikingHammers (ball-peen, claw), malletsDriving and shaping
FasteningSpanners (open, ring, socket), screwdrivers, Allen keysTightening and loosening
DrillingHand drill, electric drill, bitsMaking holes
Power toolsGrinder, welding machine (arc), compressorRepairs and fabrication
LubricationGrease gun, oil canMaintenance

Safety: goggles for grinding and welding, a welding helmet, gloves, safety boots; no loose clothing near rotating machines; the right spanner size (no "adjustable on every nut"); keep the floor clear of oil; fire extinguisher near fuel.

Building materials on the farm

  • Timber: hardwoods (iroko, mahogany) for frames, softwoods for light work; treat against termites.
  • Bamboo and palm fronds: cheap local structures (nursery shades).
  • Concrete: cement + sand + gravel + water; strong in compression; reinforced with steel bars for beams and slabs.
  • Sandcrete blocks (cement and sand): walls of pens, stores, poultry houses; common sizes 450 × 225 × 225 mm (9 inch) and 450 × 225 × 150 mm (6 inch).
  • Burnt bricks and laterite: local walling.
  • Metals: mild steel (frames, gates), galvanised steel (roofing sheets, wire mesh), aluminium (roofing).
  • Roofing: corrugated iron or aluminium sheets, asbestos-free fibre cement, thatch.
  • Wire mesh and chain-link: poultry houses and fencing.

Worked example: concrete for a floor

A poultry house floor 10 m × 6 m, 100 mm thick, mix 1:2:4 (cement:sand:gravel by volume).

  • Wet volume = 10 × 6 × 0.1 = 6 m³.
  • Dry volume (allowing for voids and shrinkage) ≈ 1.54 × 6 = 9.24 m³.
  • Total parts = 1 + 2 + 4 = 7; one part = 9.24 ÷ 7 = 1.32 m³.
  • Cement = 1.32 m³ × 1,440 kg/m³ = 1,901 kg = 1,901 ÷ 50 ≈ 38 bags.
  • Sand = 2 × 1.32 = 2.64 m³; gravel = 4 × 1.32 = 5.28 m³.

Check: 1.32 + 2.64 + 5.28 = 9.24 m³. ✓ At an assumed ₦9,000 per bag (practice figure), cement costs about 38 × ₦9,000 = ₦342,000.

Siting farm buildings

Well-drained, slightly raised ground; access road; water and power; poultry houses oriented east to west (long side) to reduce direct sun on the walls; good ventilation; away from homes for odour and disease control.

Exams usually ask: name and describe workshop tools and their uses; state workshop safety rules; describe materials used for farm buildings; calculate materials for a concrete job.

Common mistake: working out cement from the wet volume of the slab. Dry materials shrink when mixed with water; multiply by about 1.54 first.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

We link to free material and never copy it. Every link was opened by our team before it went up.

All AGR 202 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.