ACT 232 · Introduction to Cost and Management Accounting

Standard costing and variance analysis

Setting standard costs and calculating material, labour, overhead and sales variances.

Our notes

2 min read

Standard costs

A standard cost is a planned unit cost, built from standard quantities and standard prices: "each loaf uses 0.4 kg of flour at ₦1,200 a kg and 0.1 hours of labour at ₦1,500 an hour". Standards may be ideal (perfect conditions), attainable (with normal waste and breaks; best for motivation), or current.

Variance = difference between standard (or budget) and actual. Favourable (F) if it raises profit; adverse (A) if it lowers it.

Material variances

  • Price variance = (standard price − actual price) × actual quantity bought.
  • Usage variance = (standard quantity for actual output − actual quantity used) × standard price.

Labour variances

  • Rate variance = (standard rate − actual rate) × actual hours paid.
  • Efficiency variance = (standard hours for actual output − actual hours worked) × standard rate.
  • Idle time variance = idle hours × standard rate (adverse).

Worked example

Standard per unit: 4 kg at ₦250 = ₦1,000; 2 hours at ₦1,200 = ₦2,400. Actual for 1,000 units: 4,300 kg bought and used for ₦1,032,000 (₦240 a kg); 1,900 hours paid and worked for ₦2,375,000 (₦1,250 an hour).

Materials:

  • Price = (250 − 240) × 4,300 = ₦43,000 F.
  • Usage = (4,000 − 4,300) × 250 = ₦75,000 A.
  • Total = standard 1,000,000 − actual 1,032,000 = ₦32,000 A ✓ (43,000 F − 75,000 A).

Labour:

  • Rate = (1,200 − 1,250) × 1,900 = ₦95,000 A.
  • Efficiency = (2,000 − 1,900) × 1,200 = ₦120,000 F.
  • Total = 2,400,000 − 2,375,000 = ₦25,000 F ✓.

The cheaper material may have been poorer, causing more waste (the price and usage variances are linked); more skilled, dearer labour may explain the rate and efficiency variances.

Overhead and sales variances (outline)

  • Variable overhead: expenditure and efficiency, like labour.
  • Fixed overhead: expenditure (budget − actual) and, under absorption costing, volume.
  • Sales price variance = (actual price − standard price) × actual units sold; sales volume variance = (actual units − budgeted units) × standard profit (or contribution) per unit.

Using variances

Investigate significant variances (large in amount or percentage, or a trend), find causes, and act. Not every adverse variance is someone's fault: prices may have risen across the market.

Exams usually ask

  • Calculate material and labour variances and reconcile to the total.
  • Suggest causes of variances and explain how they may be linked.

Common mistake

Using the actual quantity instead of the standard quantity for actual output in the usage and efficiency variances.

Written by the UniHive team in our own words. Spotted a mistake? Tell us on WhatsApp.

Read

Watch

Practise

We link to free material and never copy it. Every link was opened by our team before it went up; video data is a rough guide at 360p.

All ACT 232 topics

Report

Sign in to report this. It is free.

Is this your work (a lecturer, author or publisher)? Ask us to take it down.